Latest ward projections of the borough from the GLA 2015 Round Borough Preferred Option (BPO) projections.
The model and methodology are identical to that to produce the interim 2015-based housingled
projection. The only difference is the housing trajectory input data which is provided by the
borough. Full methodology papers for the housing-led and small area projection models used to
produce these outputs can be found on the London Datastore.
Request Access to Borough Preferred Option Projection Reports
You must be logged in to request access to this dataset.