Skip To Content

Latest ward projections of the borough from the GLA 2015 Round Borough Preferred Option (BPO) projections.

The model and methodology are identical to that to produce the interim 2015-based housingled
projection. The only difference is the housing trajectory input data which is provided by the
borough. Full methodology papers for the housing-led and small area projection models used to
produce these outputs can be found on the London Datastore.

 

Borough Preferred Option Projection Report - GLA Intelligence Unit  (3.18 MB)
Feb 2017
This report provides an overview of the Interim 2015-based Borough Preferred Option (BPO) projection for Barnet.
Borough Preferred Option FAQ  (33.38 kB)
Feb 2017
This short FAQ aims to outline how the BPO projections have been produced.
Barnet BPO  (3.19 MB)
  • Interim 2015-based BPO Projection
  • Development data provided by London Borough of Barnet

Note: This file contains both ward and borough projection data

(c) 2017 GLA Demography

Barnet Zero Development Projection  (3.18 MB)
Feb 2017
  • Interim 2015-based BPO Projection
  • Assumes no new housing development in Barnet

Note: This file contains both ward and borough projection data

(c) 2017 GLA Demography

About this dataset

Last Update
Created 5 years ago, updated 5 months ago
Licence
Update Frequency One off
Next Update Due 28th June 2017
Next Review Date 9th May 2018
Contact
Retention Period 5 years
Service Area Information Management Team
Unit Commissioning